The project is one of five schools which have been delivered in parallel, on which C.J. Falconer & Associates have acted as architects, as part of the ABM Design and Build Ltd Team, for under the Department of Education & Skills’ Design and Build Schools Framework 1, Lot 1.
The development consists of the construction of a three storey, split level school building, Pelletstown ETNS (RN 203921) – floor area of 3,305 m2.
It facilitates a 16 classroom primary school with a two classroom Special Needs unit. The design also included a general purpose hall, support teaching spaces and ancillary accommodation.
The school is a three storeys with a single storey element and a roof top play space. The school also incorporates a rooftop play space, ground floor external play areas and special needs unit play-spaces and an external ball court. The project also included associated car parking, bicycle shed, access road, landscaping, connection to public services and all associated siteworks.